Load Testing

Load testing of overhead cranes, hoists, swing jibs and many more are carried out using calibrated test weights and load cells to comply with current statutory requirements.

Before carrying out the load test on your equipment a pre-inspection will be performed to ensure the equipment is within safety standards 125% of the rated capacity will be applied, under qualified supervision; all aspects of the equipment will be tested:

• Hoisting & Lowering of the load,
• Hoist brake hold, travel, trolley and bridge operations.
• Measurements will be taken before, during and after the tests to see if equipment is within the requirements
• After the load test has been completed a certificate will be provided in accordance with LEEA regulations